The Fort McHenry Tunnel is a four-tube, bi-directional tunnel that carries traffic on Interstate 95 (I-95) underneath the Baltimore Harbor. The lowest point in the Interstate System under water, the tunnel is named for nearby Fort McHenry.

The tunnel was constructed from May 1980 to November 1985, at a cost of about $750 million. At the time of its opening on November 23, 1985, it was the most expensive underwater tunnel project in the United States, a record it held until being surpassed by the Big Dig project in Boston. , it is used by 43.4 million vehicles annually.

Fort McHenry Tunnel

Tolls are collected in both directions. The toll for cars is $3 with a Maryland E-ZPass and $4 with another state's E-ZPass. Vehicles without an E-ZPass pay more, as do those with more than two axles, up to $45 for a 6+ axle vehicle without an E-ZPass. All-electronic tolling using E-ZPass or toll-by-plate started in March 2020 as a result of the COVID-19 pandemic and was made permanent in August 2020. A project to demolish the toll plaza and replace it with overhead gantries started in 2022.

Fort McHenry Tunnel

Location

The tunnel crosses the Patapsco River, just south of Fort McHenry and connects the Locust Point and Canton areas of Baltimore City.

Fort McHenry Tunnel

Design and construction

Plans for a second crossing of the Baltimore Harbor that would become the Fort McHenry Tunnel began in the late 1960s. Early plans called for an 8-lane double-deck bridge to carry I-95 over the harbor just south of Fort McHenry. In 1975, plans were changed from a bridge to a tunnel when it was determined that a bridge would have detrimental impact on Fort McHenry's status as a national monument. The state of Maryland originally intended to build the tunnel with a reinforced concrete box design, but plans were changed in February 1976 to use a steel tubular design after a dispute with the Federal Highway Administration. The tunnel was to be constructed using the immersed tube method, with prefabricated tubes sunken into the harbor.

Construction began in May 1980 by K-R-T (a joint venture between Peter Kiewit Sons Company, Raymond International Builders, and Tidewater Construction Corporation), and was completed in November 1985. 90 percent of construction costs were covered by federal funding, while 10 percent came from state funding. The tunnel consists of 32 tube sections, each wide and tall. The east and west approaches are and long, respectively.

The opening of the tunnel closed a gap that previously existed in I-95 through Maryland. The Fort McHenry Tunnel was opened on time and under its budget, and it continues to be a vital transportation link in the Mid-Atlantic region. Soon after the Fort McHenry Tunnel opened, the nearby Baltimore Harbor Tunnel, which had opened to traffic in 1957, was extensively rehabilitated.

See also

Francis Scott Key Bridge (Baltimore)

References

External links

Fort McHenry Tunnel—history and technical info by Roads to the Future

Crossings of the Patapsco River

Transportation buildings and structures in Baltimore

Toll tunnels in Maryland

Tolled sections of Interstate Highways

Interstate 95

Tunnels completed in 1985

Articles containing video clips

Road tunnels in Maryland

Immersed tube tunnels in the United States